Welcome

A A  

 

Posts » work in progress

Transforming rehabilitation medicine and education in Haiti

14 November 2011

Healthcare Design 2011, Nashville, TN

Jay Verspyck AIA, Shepley Bulfinch
Koji Nakashima MD, Partners In Health
Andree LeRoy MD, Spaulding Rehabilitation Hospital

Saint Peter’s College breaks ground on student center

Thursday, 27 October 2011

Saint Peter’s College broke ground on the MacMahon Student Center October 26 in a ceremony attended by members of the college community and civic and political leaders.

In his remarks, Jersey City Mayor Jerramiah Healey noted that the 84,000 s.f. building would be transformative not only as Saint Peter’s first student center, but also in its wider role in the revitalization of McGinley Square and Jersey City.

Student Government Association president Venny Turner expressed the anticipation felt by resident and commuter students alike, and called it “Saint Peter’s ...[more]

Milestone for University of Houston project

Monday, 12 September 2011

A “topping out” ceremony on September 9 marked the symbolic installation of the last piece of structural steel for the Health and Biomedical Sciences Center at the University of Houston, which will feature the College of Optometry’s Vision Institute. In keeping with tradition, a small tree and a flag were attached to the steel beam, which bears the signatures of those involved in the project from the university and the design and construction team. Dr Earl Smith, dean of the UH College of Optometry spoke at ...[more]

Expansion planned for Duke West Union

Thursday, 8 September 2011

What do you get when you bring together hungry students, the need for social spaces, and a great design? In this case, the answer is the renovation and expansion of Duke University’s landmark West Union.

Now in design, the project will create a social hub with a range of dining options, drawing students and faculty from across the school’s West Campus.

Programming and conceptual design have followed an assessment of the building completed earlier this summer. The project will preserve the West Union’s Collegiate Gothic façade while renovating 52,000 square feet of space and using an interior courtyard to create 52,550 square feet of new space.

The West Union project is preliminarily planned ...[more]

Work starts for Illinois Wesleyan academic building

Tuesday, 23 August 2011

Bloomington, IL – Site preparation is now underway at Illinois Wesleyan for the newest addition to the university’s main quad: a technology-rich classroom building with a wide array of classroom, study, and social spaces.

Sustainability is the watchword from project outset, as construction waste and debris from the site is recycled. The brick-clad building will be highly energy-efficient, with generous use of natural light and a geothermal field below.

The new classroom building is Shepley Bulfinch’s third project on the Illinois Wesleyan campus, following the Ames Library, which opened in ...[more]

Double Cask begins design in Phoenix

Thursday, 4 August 2011

Shepley Bulfinch has been selected to design Double Cask, a restaurant, bar and market concept slated to open in Avondale, Arizona, later this year. The project, a 5,700 square foot tenant improvement in a new building shell, is now in the design phase.

Double Cask is Shepley Bulfinch’s latest hospitality project in the Phoenix area in the past 48 months. Craig DeMarco’s Windsor and Churn opened in north central Phoenix earlier this year.

The project is based on the idea of a European gastro pub, which combines a large ...[more]

IDEA Center breaks ground at Austin College

Wednesday, 29 June 2011

Austin College president Marjorie Hass welcomed trustees, distinguished alumni, and other guests at a June 3 groundbreaking ceremony for the IDEA Center, the Sherman, Texas, college’s new science and technology complex.

Twelve years in the planning, the 103,000 s.f. Center will emphasize breaking down boundaries between disciplines, housing the departments of physics, chemistry, biology, environmental studies, math, and computer science in one facility. A centerpiece of the new academic building is a domed observatory, with a 24” telescope that will be among the best among the country’s liberal arts institutions.

The IDEA ...[more]

Construction milestone for Children’s Hospital of Michigan

Friday, 24 June 2011

In a ceremony earlier today at DMC Children’s Hospital of Michigan, the final steel beam was raised to the top of the new Children’s Hospital of Michigan Specialty Center-Detroit.

Children’s Hospital of Michigan President Herman Gray, MD, provided an update on the specialty center’s progress. DMC President and CEO Mike Duggan joined Dr. Gray in signing the final beam. The program concluded with the traditional placement of the beam with a live evergreen tree on top of the new building.

Throughout the week, in commemoration of the hospital’s 125th ...[more]