Welcome

A A  

 

Posts » sherman hospital

Geothermal lake wins $956k US Department of Energy award

Wednesday, 18 February 2009

WASHINGTON, DC – Sherman Hospital has received a $956,000 award from the US Department of Energy for its geothermal lake at the hospital’s new campus in Elgin, Illinois. The hospital is scheduled to open at the end of the year. In announcing the receipt of the award today, Sherman president and CEO Rick Floyd said, “Sherman Health is honored to receive this award… Our lake is environmentally sound, and we look forward to supporting green energy initiatives in our community and throughout the country.”

The award was funded through the FY08 Energy and Water Development Appropriations Act, and was designated as one of 117 congressionally directed projects within the Department’s Office ...[more]

Hospital's innovative geothermal system draws press attention

Tuesday, 15 July 2008

ELGIN, IL – The innovative geothermal system at Sherman Hospital, now under construction in Elgin, Illinois, is drawing national and regional press attention this month.

The operational and economic value of the geothermal system, as well as the technology behind it, are discussed in July’s Healthcare Design feature, “Running Hot and Cold”, by Shepley Bulfinch Principal Jonathan Gyory. Shorter pieces have run in the Chicago Tribune and other regional press.

The project is the world’s largest geothermal hospital project currently under construction. The 154-acre site includes a 15-acre manmade lake with a geothermal “net” at the bottom. Installation of the geothermal system, which carried a first-cost price tag of $4.5 million when ...[more]

Sherman Hospital in Midwest Construction Top 20 Starts

Friday, 1 June 2007

Midwest Construction Magazine has placed the Sherman Hospital replacement campus project in Elgin, Illinois, eighth on its list of Top 20 Project Starts.

The $310 million project, which is located on a 154-acre site, includes a 650,000 s.f. hospital facility and a 100,000 s.f. medical office building.

One innovative aspect of the project is a fifteen-acre manmade geothermal lake, which is projected to generate substantial energy savings for hospital operations.

Shepley Bulfinch is working with associate architects Loebl, Schlossman & Hackl of Chicago on the Sherman project, which is scheduled for completion in 2009.

Designing for Changing Demographics and Healthcare Delivery Systems

5 November 2006

Healthcare Design '06 - Chicago, IL

Nilay Deshmukh presenting with Sherman Hospital

Geothermal Energy System for Healthcare: A Case Study for Sustainability

24 October 2006

Symposium on Healthcare Design (HFSE) - Chicago, IL

Jonathan Gyory presenting with KJWW Engineering and Boldt Consulting Services